And then there was electrical and plumbing!
Soon the low voltage stuff will go in and we’ll have our pre-drywall walk through.
Baby K picked up bits of PVC and “swept” up the wood shavings from where the pipes went through the framing. She left the house with a small piece of pipe in her pocket and a longer piece with and elbow on each end in her hand. (Birdie went through the box of fittings to make sure she had something fun.)
Brittany at the sales office called YBW last week with an update, and gave him a June/July move in timeframe. Of course this is approximate, but it’s much sooner than the initial September/October we got when we first stated our interest. And the July/August they told us when we gave our deposit.
Yay!
❤❤
So exciting! 🦋💝🕊