Turns out I have a new title to add to my list.
Project Manager.
I mean, it’s not that serious, the title. However the project is pretty serious.
The project is getting this house ready to go on the market.
I mentioned I was concerned it felt like a long time, but between now and May isn’t all that long.
And though the list isn’t terribly long, it’s still a list.
Remodeling will be tricky with extra people in the house. But we’re just going to have to find a way to make it work. Since we’ll be down two bathrooms, (hopefully one at a time) Thing G is moving to his mom’s sooner than originally planned. He expressed his disappointment and anxiety. YBW encouraged him to examine what about the change was causing his anxiety. Thing 1 assured him leaving the home he grew up in was a big deal so feeling anxious about it was normal. YBW and I were gentle with him when we made it clear he was truly without choice in the matter and reassured him of our love and support. We reminded him he was not being thrown to the wolves but going to his other parent where he would be loved and supported. He’s accepting of the situation, and we’re accepting of his feels.
YBW and I created a preliminary timeline yesterday. One that we’re both comfortable with. It started out a bit with him questioning my proposed timing. But then I expressed my concern about pushing everything off. I said I’d rather get it all done and breathe than be panicked about getting it finished in time. When I likened it to his travel anxiety he had an ah-ha moment and agreed to my proposed timeline. (He’d rather get to the airport early, get through security then use that extra time to walk around or sit at the gate than be running through the airport to get to the gate before the plane door closes. TBPH, I feel the same damn way.)
So our prelim timeline looks like two bathrooms asap, one right after the other.
Painting immediately after the holidays.
Flooring in March.
Pressure washing the exterior and lawn and garden touch ups in April.
All the myriad things can be inserted when and where most applicable.
The master bath plain old boring builder grade stuff that’s never been changed in the twenty years YBW’s lived here. We talked about changing it many times and right about the time we were ready to pull the trigger, the new house became a thing and we abandoned those elaborate plans.
Now we’re just going to update the floor and tile, light fixture, faucets, and cabinets.
Thing 1 and I went looking at tile Friday morning. (both my girls love any excuse for a trip to the hardware store)
We found this tile for the shower and tub surround.
We chose these beautiful porcelain tiles. The white ones are .79 and the carrara looking ones are .99 and I plan to set them vertically. We found 12 x 12 squares in a gorgeous gray for the floor.
Done and done.
On my calendar today is to call the contractors.
My notebook and pen are at the ready!
I got this!
You are going to be awesome!! 💗💗
Thanks, girl!
xoxo ❤
Love the tile!
Thanks! ❤